- INTELBRÁS S.A.
IPC standards insertion for projects and acceptability criterion, training, workshops and auditing al electronic assembling lines. 2009
- ANCAE/MULTICIRCUITS TECHNOLOGIA LTDA.
Chemical process costs cutting back. 2008
Production losses cutting back. 2008
Quality products improvments. 2008
Asian supplyers auditing. 2008 – 2009
Raw materials supplyers development at Asia. 2009
Waste treatment system insertion. 2010Rainwater harvesting system insertion. 2009
Solid waste environmental management. 2008
- MICTTER CIRCUITOS IMPRESSOS LTDA.
ISO 9000 quality system standard insertion management. 2011
Metal Core LED printed circuits boards process development. 2011
Stainless steel PCBA stencil development. 2011
Chemical process costs cutting back. 2011
Production losses cutting back. 2011
Quality products improvments. 2010
Asian supplyers auditing. 2012
Raw materials supplyers development at Asia. 2012
Waste treatment system insertion. 2009
Rainwater harvesting system insertion. 2009
Solid waste environmental management. 2010
Conductive Polymer direct metallization insertion. 2011
- GRAN ENILA COM. EQUIPAMENTOS LTDA.
Advising on the acquiring of parts and optical instruments at Asia. 2013
- THEVEAR ELETRÔNICA LTDA.
Waste treatment system insertion. 2003
Rainwater harvesting system insertion. 2003
Solid waste environmental management. 2003
Cutting public water consumption back. 2003
Reuse of treated effluent in the industry. 2003
- PK CIRCUITOS IMPRESSOS IND. E COM. LTDA.
Multilayer printed circuit board manufacturing development. 2003
- CONTINENTAL BRASIL IND. AUTOMOTIVA LTDA. (SIEMENS)
Assistance in solving problems of high electrical resistance in carbon keyboards from Asian suppliers of circuit boards. 2006
- EUROTRONICS ELETRÔNICA LTDA.
Evaluation of the implanted structure and auditing processes (hired by Multicircuitos Technology Ltd., for feasibility acquisition of the business). 206
- TECNEL ELETRONICA LTDA.
Printed circuit board manufacturing development. 2010 – 2012
Plant layout with changes aimed at improving the productive flow. 2011
Image Transfer by Photo Polymeric film training. 2013
Lecture on Multilayer Printed Circuits. 2015
- MONTÉCNICA
Chemical processes improvement in particular in the plating line for chemical and electrolytic copper lines. 2012
Chemical process costs cutting back. 2012Metallization failures mitigation, shorts and opens detected in the electrical test. 2012 – 2013
Metallographic tests inserting and qualitative analysis such as cell Hull. 2013
Processes and equipment insertion and monitoring. 2013
Plant layout with changes aimed at improving the productive flow. 2013
- ULTRACIRCUIT/CIRMONT
Chemical processes improvement in particular in the plating line for chemical and electrolytic copper lines. 2013
Polishing process inserting by blasting via Pumice on copper surface improving films adhesion, paints and electroplated metal, decreasing the incidence of short circuits. 2013
Metallization failures mitigation, shorts and opens detected in the electrical test due to the liquid film application control. 2014
Lay out the factory with changes aimed at improving the productive flow. 2014
- MICROTECH
Printed circuit board manufacturing development. 2015
Lay out the factory with changes aimed at improving the productive flow. 2014
- PANTOQUIMICA ENTHONE
Process problems solving and staff training, as well as customers, in metallized printed circuit manufacturing process, via direct metallization for conductive polymer ENVISION ®. 2015
- MICROTECH
Printed Circuit Boards double face plated thru holes development process, where we added dry-film image transfer and controls through chemical analysis and cross section. Begining of waste treatment.
- GRIFFUS
CAD/CAM dept. management with main goal to reduce delays and to promote improvements for services quality.
Improvement of begeining of PCB process such as innerlayer manufactoring and drilling process management.
Improvement in chemical process generally.
- GEMALTO
Consulting for module electronic assembling process.